New products

Show 241 to 250 (of in total 401 products)
TERMINAL_DUAL_M8_RT
- dual terminal stud M8, red
Shipping time: 2-3 Working Days
5,95 EUR
19 % VAT incl. excl. Shipping costs
TERMINAL_DUAL_M8_BB_SW
- dual terminal stud M8, black
Shipping time: 2-3 Working Days
7,14 EUR
19 % VAT incl. excl. Shipping costs
TERMINAL_DUAL_M8_BB_RT

- dual terminal stud M8 red

Shipping time: 2-3 Working Days
7,14 EUR
19 % VAT incl. excl. Shipping costs
BB_150A_4X_1/4
- 4-way busbar 150A 48V
Shipping time: 2-3 Working Days
17,85 EUR
19 % VAT incl. excl. Shipping costs
BB_300A_4X_M8_SW
- Heavy duty busbar box M8 300 A
Shipping time: 2-3 Working Days
28,56 EUR
19 % VAT incl. excl. Shipping costs
BB_300A_4X_M8_RT
- Heavy duty busbar box M8 300 A, red
Shipping time: 2-3 Working Days
28,56 EUR
19 % VAT incl. excl. Shipping costs
BB_250A_6X_5/16
- 6 way busbar 250A 48V
Shipping time: 2-3 Working Days
35,70 EUR
19 % VAT incl. excl. Shipping costs
BB_250A_4X_5/16
4-way busbar 250A 48V
Shipping time: 2-3 Working Days
33,32 EUR
19 % VAT incl. excl. Shipping costs
Loan tool PV-WZ4-SET

MC4 Tool case PV-WZ4-SET - plastic case with tools for assembly of PV connectors

Case PV-WZ4-SET including:

  • PV-CZM-19100 - Crimping pliers 2.5 mm²; 4 mm²; 6 mm² / 14 AWG; 12 AWG; 10 AWG
  • PV-MS - Open-end spanner set
  • It contains a crimping pliers for  4 mm² und 10 mm² as well
  • Plastic box
Shipping time: 2-3 Working Days
20,00 EUR
19 % VAT incl. excl. Shipping costs
Loan tool KNIPEX_989912
98 99 12 Standard Tool Case 26 parts With insulated tools for works on electrical installations
Shipping time: 2-3 Working Days
36,00 EUR
19 % VAT incl. excl. Shipping costs
Show 241 to 250 (of in total 401 products)
Quick purchase

Please enter the article no. from our catalogue.

Welcome back!
Manufacturer
Shipping country